Rudeloff Road (East of SH 46 to the existing curve in Huber Road CR 105)
Scope: MPO Capacity Improvements/Thoroughfare Plan Project to include ±8,200 LF of 60’ asphalt roadway consisting of 5 – 12’ wide lanes, including bike and sidewalk shared path, sidewalks, and drainage improvements to Rudeloff Road.
Update:
Utility Relocations underway in preparation for Road Construction. Project will be advertised to Bid July 2022 and construction of the road project is anticipated to commence Fall 2022 after utilities are relocated.
- To view a preliminary map of the project limits click here
Rudeloff Road (Huber - East of Softball Fields to SH 123 at FM 20)
Scope: Utility Relocations underway in preparation for Road Construction. Project will be advertised to Bid July 2022 and construction of the road project is anticipated to commence Fall 2022 after utilities are relocated.
Update: Design Phase began February 2022, and meetings with affected property owners are ongoing. A public hearing will be required early in the process to establish an acceptable roadway alignment through the undeveloped farmland. A schematic alignment is expected to be presented to the public in Fall 2022. Construction anticipated to begin in Fall 2024.
Cordova Road (SH 46 to SH 123)
Scope: The joint City/County Project has received notice of funding through the Metropolitan Planning Organization (MPO) as part of Federal Highway Administration Grant. The Funding will be available after October 2023 as part of the FY 2023-2026 Transportation Improvements Project Grant (TIP). The project consists of widening Cordova Road to 4 – 12’ wide travel lanes, a raised 14’ wide median, left turn bays, drainage improvements, and pedestrian/bicycle shared use paths along both sides of the project. Realignment of Cordova Road at Three Oaks Road to provide a signalized intersection is part of the project scope.
Update: Award of the project and project design is planned for late July 2022. The design process will require 2 – 3 years of development to complete the construction and environmental documents, acquire right-of-way, and relocate utilities in accordance with Federal requirements per the Grant. Construction is anticipated to begin early 2025 and end in late 2027.
Community Block Development Grant (CDBG) Main Street Sidewalks Project
Scope: The project includes reconstruction of sidewalks along the 200 block of East Court Street between River and Crockett Streets, the 100 Block of West Gonzales Street (southern side) and includes curb island extension and other related improvements to meet accessibility requirements for the project limits. Accessibility will be improved to 6 downtown building entrances as part of grant project that is currently in design.
Update: South side of Court Street complete. Waiting on fabrication of inlets expected August 1. Time extended 60 days per pending change order submitted to TDA. Remaining work on north side of Court and Crockett including bulb-out, and miscellaneous work at Camp and Gonzales Streets.
Estimated Completion Date: Construction to be completed Fall 2022.
Stratton-Jefferson-Guadalupe-Nelda Street Sidewalk Project
Scope: The City has received notice of funding of the $2.3M sidewalk project through the Metropolitan Planning Organization (MPO) as part of Federal Highway Administration Grant. The Funding will be available after October 2023 as part of the FY 2023-2026 Transportation Alternatives Program Grant (TAP). The project consists of construction of concrete sidewalk and shared use path, retaining walls, and drainage improvements as necessary to provide an accessible route on South Guadalupe Street to the Seguin Coliseum, along Nelda and Stratton Streets to provide connectivity between City Parks and Library, Seguin Housing Authority, and Seguin ISD facilities.
Update: Funding will be available Fall 2022; Design anticipated to begin early 2023 to meet the 2026 construction timeline per the grant.
Walnut Creek Regional Detention and Low Water Crossing
Scope: The City has received notice of funding of the $8.6M project through the General Land Office (GLO) CDBG-MIT Grant. The project consists of increasing the size of the existing regional detention basin near IH-10 and Fleming Drive and replacing existing low water crossings to pass the 100-year flood. The Aldama Street intersection at Kingsbury Street will be improved, the low water crossing at San Antonio Ave. and Walnut Branch will be replaced with a bridge, and the low water crossing at Williams Street and Walnut Branch will be replaced with a bridge.
Update: Project in design. 30% Progress set anticipated Summer 2022; Construction is scheduled to begin in early 2025 and end in early 2027.
North Guadalupe Drainage System
Scope: The City has received notice of funding of the $8.3M project through the General Land Office (GLO) CDBG-MIT Grant. The project consists of constructing a new regional detention basin to serve an existing residential area near Guadalupe Street north of the railroad. Drainage improvements will be provided for adjacent commercial and industrial developments. Improvements in the FM 78 and UPRR rights-of-way, including channel regrading, will be completed to improve drainage in the area.
Update: Project in design with 30% plans expected Summer 2022. Survey and geotechnical investigation in progress.
Mays Creek
Scope: The City has received notice of funding of the $3.9M project through the General Land Office (GLO) CDBG-MIT Grant. The project consists of replacing existing culverts on SH 46, FM 725, River Oaks Dr, and CR 402 to address flooding concerns. A new access point out of the Chaparral Subdivision will be constructed to provide secondary access during flooding events.
Update: Project in design. 30% Progress set anticipated Summer 2022; Construction is scheduled to begin in early 2025 and end in early 2027.
Heideke Storm Water Trunk Installation and UPRR Channel Renovation
Scope: The City has received notice of funding of the $10.5M project through the General Land Office (GLO) CDBG-MIT Grant. The project consists of improving the existing drainage channel along the UPRR to increase capacity during storm events. A new storm sewer trunk will be installed in the Heideke St. Right Of Way to serve the existing residential area.
Update: Survey and preliminary investigations in progress pending ROE from landowners and UPPR.
Walnut Springs Trail Extension - Phase II
Location: Convent to Max Starcke Park East
Scope: The City has been awarded funding through TxDOT as part of the Alamo Area MPO. The project area extends the Walnut Springs Trail from the Ruby P. Vaughan Bridge on Convent Street south to Max Starcke Park East. Consists of .44 miles of 10-foot-wide concrete hike and bike trail along the west side of Walnut Branch Creek that will include limestone block retaining walls, hand and guard rails, and Seguin’s first below-grade crossing under the South Austin bridge. Design is complete by TRC Engineering. Currently working on acquisition and acquiring right of ways and easements. Bid has been awarded to Myers Concrete Construction.
Update: All columns poured for bridge. One cap remaining. Heart-shaped well in place pending finish work with grouted rocks. Working on retaining wall north of Guadalupe Street. Redesign complete for waterline conflict south of Guadalupe Street removing landings and rail originally proposed.
ECD: Fall 2022
King & Spruce Street Utility and Streets Improvement
Scope: The project includes storm drainage improvements and approximately 2,750 linear feet of concrete street improvements from Pine Street to the Union Pacific Railroad. Bid was awarded to Capital Excavation. Construction started July 2019.
Update: Project is complete. Sidewalks replaced and inspected by consultant who provided acceptance letter. Change order approved for sidewalks and additional engineering services. Project closeout pending warranty for sidewalks and channel work.
Walnut Branch Sanitary Sewer Phase II
Location: Seguin Public Library to Max Starcke Park East
Scope: Under the design of TRC Engineering, the project will include replacing and upgrading the sanitary sewer line located in Walnut Branch from West Nolte Street to the Wastewater Treatment Facility. The current 18” main will be upgraded to a 36” and 42” sewer main.
Update: Sewer construction is complete. Contractor has completed their portion of the 12” water line. The only item remaining for the contractor is to install sod along the creek. City crews will complete tie-in when work on Shelby is complete.
ECD: Work completed Summer 2022.
Milam Street Re-Construction and Milam Street Drainage and Utility
Scope: The project is from Mountain Street to Kingsbury Street and will include storm drainage, water and sewer improvements, street reconstruction and sidewalk on one side of roadway.
Update: Waterline upgrade plans and Weinert water and sewer extension plans submitted and under review. Acquisitions of right-of-way and easements and final review of plans in progress.
Estimated Completion Date: To be determined; 14-month construction schedule anticipated.
Walnut Branch Sanitary Sewer Phase III
Location: West Kingsbury Street to New Braunfels Street
Scope: Under the design of TRC Engineering, the project will include approximately 3,400 linear feet of 30" diameter gravity sewer main within Walnut Branch extending from the north side of West Kingsbury Street to New Braunfels Street (north side of the railroad).
Estimated Completion Date: To be determined. TRC working on environmental clearance.
Walnut Branch Sanitary Sewer Phase IV
Location: North of Court Street to Seguin Public Library below Nolte Street
Scope: Preliminary Design to establish several alignments for the replacement and upgrade of the existing 24-inch diameter gravity sewer which runs through Walnut Springs Park. The project will include replacement of approximately 1,500 linear feet of 30 – 36” diameter gravity sewer main.
Update: 90% design complete.
ECD: 9-month construction schedule anticipated to begin Fall 2022.
Eighth Street Extension (EDA Grant)
Location: Eighth Street from end of existing road to the railroad tracks.
Scope: The City has been awarded funding through the U.S. Department of Commerce Economic Development Administration (EDA). Project consists of 750’ of concrete roadway including drainage and sidewalks.
Estimated Completion Date: Early 2023.
Mesquite Street Extension
Location: Mesquite Street north of Austin Street to just north of Starcke Street.
Scope: The project is currently in design by Doucet & Associates and consists of extending Mesquite Street north of Austin Street to just north of Starcke Street.
Update: Project is in design and 90% design plans are under review. Design phase should be completed by Summer 2022. Construction to be added to the 5 year CIP Plan as part of the FY2022-23 Capital Improvements 5-year roadway plan. The road will need to be re-named per Guadalupe GIS requirements and approved by City Council.
Estimated Completion Date: To be determined.
Geronimo Creek Wastewater Line Assessment
Location: Influent WW line from GCWWTP north towards Keller Lane
Scope: Clear easement for access, install gates at various property lines, and perform sanitary sewer survey and repairs as necessary.
Update: Complete and staff has submitted testing results to TCEQ.
Estimated Completion Date: 4th quarter 2022
Sludge Line Replacement
Location: Water Plant to Walnut Branch WWTP
Scope: Design the replacement of the sludge line used to transport water plant sludge to the Walnut Branch WWTP for treatment/disposal.
Update: Bid awarded to M & C Fonseco and construction is beginning.
ECD: TBD
Geronimo Creek Waste Water Treatment Plant Expansion
Location: Geronimo Creek Waste Water Treatment Plant
Scope: Under the design of TRC Engineering, the project will include the expansion of the Geronimo Creek WWTP from 2.18 MGD to 5.54 MGD.
Update: Design is 100%. Easement acquisition is underway.
ECD: To be determined. Expansion project approved and Walnut Branch Wastewater Treatment Plant will be abandoned. Design is underway and a TWDB funding application has been submitted and is under technical review.
Public Works Projects
Chip Seal Projects (Scheduled in 2022):
- Aldama from Kingsbury to dead-end - COMPLETE
- Woodstone from Rudeloff to dead-end - COMPLETE
- Rudeloff from Hwy 46 to Woodstone - COMPLETE
- Gamecock from FM 725 to FM467 - COMPLETE
- Tanglewood from Gamecock to FM 725 - COMPLETE
- Sabinal from Nueces to Colorado - COMPLETE
- Colorado from Guadalupe River to Rio Grande - COMPLETE
- Llano from Nueces to Colorado - COMPLETE
- Nueces from Guadalupe River to Rio Grande - COMPLETE
- Brazos from Guadalupe River to Rio Grande - COMPLETE
- MilTex from Hwy 90 to dead-end - COMPLETE
- Old Ilka from Hwy 90 to dead-end - COMPLETE
- Jahns from Hwy 90 Alternate to dead-end - COMPLETE
- Ilka Switch from Kingsbury to dead-end - COMPLETE
Zipper Road Stabilization Projects (Scheduled in 2022):
- Pecan from Austin to dead-end - COMPLETE
- Gerdes from Austin to Pecan - COMPLETE
- Dolle from Cemetery to dead-end - Work is currently underway
- Dibrell from Guadalupe to Dolle - Work is currently underway
- Shannon from Dibrell to Jones - Work is currently underway
- Chapman from Baxter to Seideman - Work starts July 28
- Trinity from Guadalupe to Rio Grande - COMPLETE
- Champions from Rio Grande to River Oak - COMPLETE
- Nagel from Stockdale Hwy to dead-end - Work is underway
- San Marcos from Court to Nolte
- Humphreys from San Marcos to Milam
- Cedar from King to Cherry - Under Construction
- Erkskine from Court to Mountain - COMPLETE
- Jefferson from Short to Saunders
- Harper from Guadalupe to Austin - Work begins July 28
- Bartholamae from Kingsbury to Humphreys
- Seideman from Heideke to King
- Bowie from Cedar to Ireland
- Jefferson from Hwy 46 to Short
- River Oak from dead-end to Champion - COMPLETE from Champion to Pebble Beach
- Keller from Hummingbird to Peacock
- Cherry from Court to Tabernacle
- Tabernacle from King to Cherry
- Bruns from Ireland to Elm - COMPLETE
- Ireland from Park to Heideke - COMPLETE
- Spruce from King to Vetter
- Magnolia from Vetter to Norris
- Norris from Spruce to Sycamore
- Benbo from Guadalupe to Austin
- Sycamore from King to Vetter
- Vetter from Sycamore to Spruce
Electric Utilities Projects
- Hanna Heights – Currently working on Phases 3 – 6
- Completed the double circuit for Tyson and TLU – Working on upgrades and getting ready for expansion
- Working on maintenance and tree trimming
- Navarro Oaks - COMPLETE
- Working on the RF upgrade for the meter reading - Ongoing
- Working on meter upgrade - Ongoing
- Working on CS 40 upgrade to circuit
Seguin Commercial Development Projects (as of April 2022)
Commercial, Industrial, Public, Etc.:
- Vitesco Data Center (3740 N Austin St) – Construction in Progress
- Seguin Plaza (106 E Kingsbury) – Site Plan in Review
- GRMC Willow Medical Office Building (105 Medical Dr) – Certificate of Occupancy Issued
- Storage and More of Seguin (720 Harry Miller Pass) – Certificate of Occupancy Issued
- Mesquite Convenience Store/Gas Station (1642 N Austin St) – Construction in Progress
- Guadalupe County Justice of Peace Precinct 1 (2405 US Hwy 90 E) – Construction in Progress
- 725 Storage (150 Naumann Rd) – Building Permit in Review
- Seguin ISD AJB Middle School (1616 W Court St) – Construction in Progress
- Fujirebio Diagnostics (940 Crossroads Blvd) – Building Permit Issued
- Crispy Clean Car Wash (Eastwood & SH 123 Bypass) – Site Plan in Review
- Discount Tires (2727 N Austin St) – Building Permit in Review
- Road Ranger (2460 FM 464) – Building Permit in Review
- Quality Urgent Care (1300 State Hwy 46 N) – Building Permit Issued
- Tyson Building Addition (1200 W Kingsbury St) – Building Permit Issued
- Guadalupe County Veterans Outreach Center (205 E Weinert St) – Building Permit Issued
- Marshall & Ross Store Remodel (1386 E Court St) – Building Permit Issued
- Schulze’s Pit Room (1013 Schriewer St) – Building Permit Issued
- South Texas Pregnancy Care Center (1348 E Kingsbury St) – Site Plan in Review
- Guadalupe County Dept of Development Center (2605 N Guadalupe St) – Building Permit Issued
- United Alloy Addition Phase 2 (1721 Eighth St) – Building Permit Issued
- Texas Axeholes (1575 IH 10 W) – Building Permit in Review
- Domino’s (751 A Best Dr) – Building Permit Issued
- Macritchie RV Storage (3520 US 90W) – Site Plan in Review
- Exeter Industrial Park Phase 1 (FM 464) – Site Plan in Review
- Storage King Addition (122 Lettau Ave) – Site Plan in Review
- Storage King Addition (1842 IH 10 W) – Site Plan in Review
- NWOSU Minor Emergency Clinic (920 W Court St) – Site Plan in Review
Seguin Residential Development Projects (as of April 2022)
Single-Family Residential Subdivisions:
- Waters Edge (SH 46 & Three Oaks Rd) – Infrastructure Construction in Progress
- Twin Creeks Subdivision (31 lots in ETJ on Barbarossa) – Infrastructure Construction in Progress
- Swenson Heights (Cordova Rd) – Home Construction in Progress
- Meadows of Martindale (E. Martindale St.) – Home Construction in Progress
- Ridge View Estates (FM 725 & IH 10) – Home Construction in Progress
- Hannah Heights (FM 20) – Home Construction in Progress
- Greenspoint Heights – Home Construction in Progress
- Greenspoint Village – Concept Plan in Review
- Greenfield Subdivision (Joe Carrillo Blvd) – Home Construction in Progress
- Sky Valley Replat (SH 46) – Home Construction in Progress
- Lily Springs (SH 46 north of Cordova) – Home Construction in Progress
- Cordova Crossing (Cordova Rd) – Home Construction in Progress
- Martindale Heights (W. Martindale Street) – Home Construction in Progress
- Country Club Estates, Unit 3 (Club View) – Home Construction in Progress
- Woodside Farms – Home Construction in Progress
- Arroyo Ranch – Home Construction in Progress
- The Village of Mill Creek - Home Construction in Progress
- Navarro Oaks (E. Martindale Rd) – Home Construction in Progress
- Hiddenbrooke (SH 46) - Home Construction in Progress
- Chaparral Ranch (FM 725 & River Oak Dr) – Preliminary Plat Approved
- Cordova Trails (1200 Blk Cordova Rd) – Infrastructure Construction in Progress
- B&B Subdivision (SH 46 S & B&B Rd) – Home Construction in Progress
- Maverick Meadows (2900 Blk Cordova Rd) – Infrastructure Construction in Progress
- Park West Village – Infrastructure Construction in Progress
- Nolte Farms – Concept Plan Approved
- North Seguin Mixed Use Development – Infrastructure Construction in Progress
- Meadows of Mill Creek – Infrastructure Construction in Progress
- Three Oaks (3600 Blk SH 46 N) – Concept Plan Approved
- North Austin Heights (1700 Blk N Austin) – Infrastructure Construction in Progress
- Pecan Farms (500 Blk Continental Dr) – Concept Plan in Review
- Stream Waters (Alternate 90) – Concept Plan in Review
- Reinhard Farms (3000 Blk Cordova Rd) – Development Studies in Review
- Park House (15000 Blk FM 725) – Concept Plan in Review
- Bornman Farms (1000 Blk Cordova Rd) – Development Studies in Review
- McQueeney Point (1900 Blk FM 466) – Development Studies in Review
- Park Terrace (1600 Blk FM 466) – Development Studies in Review
- Arvin Trails (6000 Blk SH 123N) – Development Studies in Review
Two-Family Residential (Duplex) Subdivisions:
- Navarro Crossing- Duplex Construction in Progress
- King Street Duplexes (King & Lucille St.) – Duplex Construction in Progress
- Lucille Street Duplexes (King & Lucille St.) – Duplex Construction in Progress
- Jefferson Place Subdivision – Duplex Construction in Progress
- Jordan's Creek (SH 123 Bypass North) – Duplex Construction in Progress
Multi-Family Residential:
- Pecan Grove Apartments (1231 W Court St – 198 units) – Construction in Progress
Click here to view Proposed Housing & Development Dashboard